Four Seasons Hotel — Madinaty

About the project

Two contracts: the hotel basement (CP5) with all MEP trades, and the residential building (CP7). MEP shop drawings and coordination drawings are produced in Revit at LOD 400.

Shop Drawings Projects

More projects in this sector

Fairmont Hotel

Cairo, Egypt

Floor area
3,000 m² per floor
Floors
4 basements + 5 + 18 guest-room floors
Start a conversation

Have a project that needs MEP engineering?

Tell us about the building, the site and the stage you are at. We will come back with the scope, the deliverables and a proposal.