Service

Shop Drawings & BIM Coordination

Working shop drawings and coordination drawings for contracting firms — on some of the most demanding buildings in Egypt.

What we do

Evolution’s shop drawing office prepares working shop drawings and coordination drawings for contractors. References include the Fairmont Hotel and the Piraeus Bank head office for Orascom (OCI), and Clusters 3A & 4A of the Ministries Complex in the New Administrative Capital for Rowad, where the scope also included design review.

For the Four Seasons Hotel in Madinaty, MEP shop drawings and coordination drawings for the hotel basement and the residential building are produced in Revit at LOD 400.

References

Shop drawings projects

All projects
Shop drawings

Fairmont Hotel

Cairo, Egypt

Floor area
3,000 m² per floor
Floors
4 basements + 5 + 18 guest-room floors
Questions

Shop Drawings & BIM Coordination: quick answers

Does Evolution prepare shop drawings for contractors?

Yes. Preparing working shop drawings and coordination drawings for contracting firms is part of Evolution’s scope. Clients have included Orascom (OCI), Rowad and CCC–Atriam.

Does Evolution work in BIM / Revit?

Yes. For the Four Seasons Hotel in Madinaty, the MEP shop drawings and coordination drawings are produced in Revit at LOD 400.

Start a conversation

Have a project that needs MEP engineering?

Tell us about the building, the site and the stage you are at. We will come back with the scope, the deliverables and a proposal.